Type IL Cement: What Flooring Contractors Need to Know Before They Bid and Install

You are the last trade on the slab and the first one called when the floor fails, often a year or more after you leave. Type IL cement changed the slab under you, and the decisions that set the risk were made at the pour, by trades you never met. This paper covers what to ask before you bid, how to qualify the bid, what to test, how to prep, and when to say no.

The short version:

  • Get the mill certificate, cure product and finish method before you price the job.
  • Qualify the bid: the slab must meet the adhesive manufacturer's RH and pH limits, and mitigation and film removal are extra.
  • Test RH, surface pH, hardness and absorption, document everything, and don't install over a slab that fails.

1. What changed in the cement

Type IL (portland-limestone cement, ASTM C595) replaces 5–15% of the clinker with raw limestone, ground finer than the cement around it. ASTM added it in 2012, and by June 2023 it outsold ordinary portland. It meets the same strength, set and soundness requirements as Type I/II (ASTM C150), and all 50 states approve it for DOT work. What the cement spec never evaluated is how the top few millimeters behave under a flooring adhesive, and most adhesive data sheets were still written for C150 concrete.

Research from the ACI Foundation (April 2026) found Type IL performs comparably to Type I/II when it is properly finished and cured. The rest of this paper is about meeting that condition.

2. What your crews will see on pour day

Type IL gives the finisher less margin. Expect these tendencies, not guarantees:

Field evidence: in a 2024 ACI-ASCC survey of 173 contractors, 77% saw higher water demand and 43% more plastic-shrinkage cracking. In 2023 mockups, six of seven Type IL slabs crusted or tore at evaporation rates as low as 0.03–0.09 lb/ft²/h. In ASCC side-by-side mockups, water-based adhesives bonded weaker over Type IL than over Type I/II.

3. Why it matters at the floor

A Type IL slab can look ready to bond before it is. Every portland slab starts near pH 12.5–13.5; Type IL holds that pH at the surface longer:

  1. Fine limestone packs the paste, so the top few millimeters densify and dry slowly.
  2. Wet pores keep out the CO₂ that would normally carbonate and neutralize the surface.
  3. High surface pH persists, and returns after the surface is sealed and re-wetted.
  4. Low-VOC, water-based adhesives tolerate less alkalinity than the solvent products they replaced, so the bond fails, often a year or more after installation.

A hard-troweled or burnished finish, a densifier, or a film-forming cure closes those same pores further. That is why finishing and curing decide the outcome more than the mix does.

Moisture tests can miss it. ASTM F2170 (RH) and F1869 (MVER) measure moisture, not how long surface alkalinity persists, and their usual limits were set on Type I/II concrete. In the ASCC mockups, Type IL passed moisture tests nearly as well as Type I/II and still bonded weaker. Test surface pH, hardness and absorption too.

4. Before you bid: get the slab's history

Ask the GC for these in writing. Each one changes what the slab will need.

If the GC can't answer, price the risk (testing, prep and possible mitigation) or exclude it in writing.

5. Qualify your bid

Sample qualifications. Have your own attorney review them before use.

Many specifications state that starting installation means accepting the substrate. Test before you start, not after.

6. Test and document before you install

7. Prep and system selection

Renovation: existing floors

Disclosure: S3 Surface Solutions makes products in the salt-sequestering cure and pH-neutralizing remover categories; data sheets are available on request.

8. When to say no-go

Stop and put it in writing if readings exceed the adhesive limits, HVAC is not running, the surface is delaminated or dusty, or remediation has been put off "until later."

A written direction to install anyway records who made the decision. Without it, the failure is yours.

Sources

Education only. The project specifications and the flooring manufacturer's written requirements govern.

Frequently asked questions

What should a flooring contractor get before bidding over a Type IL slab?

In writing from the GC: the cement mill certificate (C150 or C595/Type IL), the mix (w/cm, SCM type and percentage, aggregate source), the finish method and any densifier, the cure product and whether its film will be removed, the vapor retarder, the pour date and when permanent HVAC will run.

Why can a Type IL slab pass moisture tests and still fail?

ASTM F2170 and F1869 measure moisture, not how long surface alkalinity persists. Type IL holds high surface pH longer, and low-VOC water-based adhesives tolerate less alkalinity, so the bond can fail a year or more after installation even when RH readings looked acceptable.

What tests should be run before installing flooring?

After 48 hours of HVAC at service conditions: RH per ASTM F2170 (3 tests in the first 1,000 sf plus 1 per additional 1,000 sf), mapped surface pH per F710 at the same density, hardness (Mohs 5 or above), absorption (F3191 water drop), a rub test for dusting and a chain drag for hollow spots. Judge readings against the adhesive manufacturer's limits, not a generic 75% RH.

How should a flooring bid be qualified for Type IL slabs?

State that the bid assumes the slab meets the adhesive manufacturer's RH, MVER and pH limits; exclude mitigation, film removal and grinding unless listed; make installation conditional on acceptable F2170 and F710 results; and exclude delays caused by slab conditions. Have your own attorney review any qualification language.

What if the surface pH is above the adhesive's limit?

Choose an adhesive whose pH limit is above the measured surface pH, or use a moisture and pH barrier rated for high alkalinity, or a pH-neutralizing, salt-sequestering treatment accepted by the flooring manufacturer, and get the flooring and adhesive manufacturers' written approval of the complete system.

When should a flooring contractor say no-go?

When readings exceed the adhesive limits, HVAC is not running, the surface is delaminated or dusty, or remediation has been put off. State the findings with results and locations, list the options with cost and time, and get written direction from the GC or owner before proceeding.

JA
About the author
Jack Aspenson is CEO of S3 Surface Solutions, which makes substrate preparation and moisture-mitigation products for flooring. Questions about this paper: jack@s3surfaces.com.
Pouring or flooring over Type IL?

Send us your mix design and project details for a free Type IL slab assessment.

Request a free assessment